GROWTH POTENTIAL
Growth in Ucluelet is inevitable and welcomed. There is more undeveloped
land than developed. The following subsections describe areas in Ucluelet,
currently undeveloped, that will see build out in the near future. These
developments will have a significant impact on the population, economy,
and environment of Ucluelet. For detailed information on these lands
please download the Uculelet Community Profile document or contact Geoff
Lyons, the Economic Development Coordinator.
Ucluelet
Community Profile document
Contact Geoff
Lyons
|
|
 |
 |
 |
| |
District Lots 281, 282,
and Whiskey Landing
These are three major developments underway within the municipality
of Ucluelet. Each of these developments are zoned Comprehensive
Development allowing for specific densities and a multitude of
uses on the lands.
The following table illustrates the potential population growth to reside
within these developments over the next three years (using an average
of 2.2 persons per dwelling.)
|
|
 |
|
 |
LOT 281
LOT 282
WHISKEY LANDING
|
220
units
150 units
21 units |
484
people
332 people
46 people
862 people, TOTAL
|
 |
| |
 |
The three developments will
also include the following commercial aspects:
3 hotels with approximately 170 rooms.
A maximum density of commercial floor space
of 68,685 ft.
These commercial entities will provide jobs for a portion of the population
projected from the residential aspects of the developments.
|
 |
| |
 |
 |
 |
 |
| |
 |
|
 |
| |
 |
| |
 |
|
 |
 |
 |
| |
Weyerhaeuser Lands
Recently, 800 acres from Tree Farm License 44 were transferred to fee
simple lands within the District of Ucluelet. The potential low-density
development of these lands will have significant impacts on population
growth and economic activity.
The undeveloped portion of land is roughly the same size as Ucluelet
today. It is estimated these lands will draw over 3,000 new residents
by 2018, that 50 acres per year will be developed beginning in 2006
and that a quarter of the land will become parkland. Owners of these
lands are being encouraged by the District of Ucluelet to employ sustainable
development strategies.
Weyerhaeuser
Lands web-site
|
|
 |
| |
 |
|
 |
 |
 |
 |
 |
| |
Eco Industrial Park
The Eco Industrial Park, consists of 40 acres (16.2 hectares) of land
providing a unique opportunity for tradespersons, industry people of
all kinds, and artisans to manufacture, distribute, and reside on the
same property.
The zoning on these properties allows for versatility and flexibility
so people can work and live on their property. The Eco Industrial Park
was also designed on the concept of sharing resources and recycling
waste materials. There are 21 lots fully serviced lots with a minimum
size of 2,000 square metres.
Ucluelet
Eco Industrial Park web-site
|
|
 |
 |
 |
| |
 |
|
 |
|
 |
 |
 |
| |
Projected Population Growth:
This graph outlines the conservative projections for growth over the
next 16 years.
District Lots 281, 282, and the Whiskey Landing project will populate
more quickly than the Weyerhaeuser Lands. With the population at roughly
2,000 people today and the projected increase of over 3,000 people by
2018, the population of Ucluelet may well be over 5,000 people in 15
years. This is more than double the current population.
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
DEVELOPMENT
INFORMATION
The District of Ucluelet encourages responsible development and staff
is eager to assist in creating a successful new business or housing
initiative for the community.
Contact
Geoff Lyons
More details and contact
information are contained in the following documents available for download.
Ucluelet
Community Profile document
Ucluelet
Business License document
Ucluelet
Zones link
Official
Community Plan web-site
|
 |
 |
 |
 |
 |
Business License:
Any person planning to operate a business or any form of commercial
activity must possess a valid business license to work within the District
of Ucluelet. Business licenses must be renewed annually and applications
are available at the District office or on the link above.
Sign Permit:
Sign applications must be approved by the Planning Department at the
District of Ucluelet before a sign is erected. Two approved project
signs of three-square metres, can be posted at constructions sites.
|
|
 |
 |
|
 |
| |
Zoning:
Zoning in Ucluelet is unique and flexible offering developers a multitude
of options for land uses. The Zoning Bylaw was created to divide the
District of Ucluelet into zones and to provide for regulations governing
the use of land, buildings, structures, off-street parking and loading,
landscaping and screening. The District of Ucluelet Bylaw regulates
the density and use of land and structures to preserve the amenities
of the District and to regulate development for the benefit of the community
as a whole.
Zoning is a tool used to implement the policies of the Official Community
Plan (OCP) and it guides the growth of the municipality in a systematic
and orderly fashion. If a proposed development or proposed changes to
existing buildings on a property do not conform with the land use or
density specified by existing zoning requirements, then a application
for Zoning Bylaw Amendment must occur. Amendments to the Zoning Bylaw
or to the OCP can only be achieved through a process of public input
and District of Ucluelet Council approval in accordance with the provisions
of the Local Government Act.
Detailed information is available in the Ucluelet Zoning Bylaw document
(23 pages): Ucluelet Zoning Bylaw document
Zones:
The District of Ucluelet is divided into approximately 26 zones. Below
are some of the zone categories:
9 Residential Zones includes Bed and Breakfast,
Vacation Home, Hostel, etc.
6 Commercial Zones specific to areas and specific to use.
2 Industrial Zones separate light industrial and medium
/ light industrial zones.
5 Comprehensive Development Zones specific uses under
an approved integrated plan.
A complete listing of zones is available via this link: Ucluelet
Zones link
|
 |
 |
 |
Development Permits:
Development Permit Areas are designated under The Local Government Act.
No building construction or alteration can occur in a Development Permit
Area without a Development Permit. Lands are designated as Development
Permit Areas in the OCP and the document includes the reasons for requiring
a permit as well as the specific guidelines used to evaluate an application.
A Development Permit is required if a development is assessed at $30,000
or more or if the development falls within a Development Permit Area.
The construction of Single Family Residential developments does not
require a Development Permit.
Detailed information is available in section IV of the Official Community
Plan Web-site:
Uclulelet Official Community Plan web-site
Development Permit areas
in Ucluelet include:
Village Square
Imperial Lane
Reef Point
Hyphocus Island
Weyerhaeuser Lands
District Lot 281
Inner Boat Basin
Peninsula Road
|
|
 |
 |
 |
 |
Subdivision:
A subdivision developer submits an application to the District Planning
Department which would include proposed plans and the lot layout. The
Director of Planning, Superintendent of Public Works, and the Chief
Administrative Officer then review the lot layout and plans. If acceptable,
a Preliminary Layout Approval (PLA) is issued once all work is completed
in accordance with the PLA. The District inspects the finished subdivision
and then the subdivision (Mylar) is registered at the Land Titles office
in Victoria. If acceptable, a Preliminary Layout Approval (PLA) is issued
once all work is completed in accordance with the PLA. The District
inspects the finished subdivision and then the subdivision (Mylar) is
registered at the Land Titles office in Victoria.
With the exception of Single Family Residential homes, the developer
is responsible for
Development Cost Charges (DCCs) paid to the District of Ucluelet prior
to provincial registration.
Building Permit:
Building Permit application forms, house number information and detailed
application requirements are available at the District office.
When applying for a Building Permit, the Building Inspector will require
the following:
Completed water and sewer connection application forms, including
site plan.
House plans, including site plan, floor plan, cross section building
plan, and elevations.
A current copy of the Land Title.
The house number(s).
Construction shall begin within six months from the date of issuance
and the work will not be discontinued or suspended for a period of more
than six months.
Water and Sewer:
Each property is required to connect to District water and sewer. Applications
are available at the District office. Mapping (a site plan) of sewer
and water lines are required.. Include on the site plan the proposed
route of the water and sewer lines to the house from the service connection,
and the location of the sewer pump if applicable
Public Works:
Under final inspection and approval by the Building Inspector, the District
of Ucluelet Public Works Department will inspect the following items
located on municipal property to ensure they meet District requirements:
Water connection at the property line;
Sanitary and Storm sewer connections at the property line;
Drainage ditches, culverts, and headwalls;
Roads, walkways, curbs, and boulevard fronting the property;
and
All Municipal right-of-ways and easements.
|
 |
 |
 |
Sustainable Development:
Sustainable development can be defined as development that does not
sacrifice long-term environmental quality for short-term benefits and
that preserves resources and the environment for future generations.
Sustainable development involves a better integration of the environment
and the economy on an ongoing basis. It does not imply total preservation
or non-development, but requires that decisions made by Council, industry,
and individuals consider all biological, social, and economic consequences
(the triple bottom line).
Smart Growth:
The District of Ucluelet can influence and control the nature and pace
of growth within the municipality. It is important for the community
to maintain its sense of place and character, while allowing for development
to occur on a manageable basis.
One of the strategies Ucluelet supports for sustainable development
is the use of Smart Growth policies, which include, but are not limited
to the following:
Undertaking development in a compact fashion.
Supporting mixed use development.
Promoting Alternative Development Standards (ADS), which include
French drains; narrower and windier roads
and Green infrastructure storm water management.
Alternative subdivision design, such as cluster housing, pedestrian
pathways and linkages, and Integration
between social equity, environment, and economy.
Protecting sensitive environmental areas.
Reducing (eliminating) detrimental economic, environmental, and
social effects of development.
Promoting multi-modal forms of transportation and Integrating
open space into daily living.
LEED:
Another strategy Ucluelet supports for sustainable development is the
use of Leadership in Energy and Environmental Design (LEED). LEED is
leading the way setting and implementing sustainable development ethics
and practices throughout North America and the world. The Canada Green
Building Council, in accordance with the Canadian Model of Energy Code,
has developed a Canadian version of the LEED rating system for Buildings
under Natural Resources Canada.
The LEED system is designed on a consultative basis with parties interested
in voluntarily incorporating green design principles in
new or renovation projects. Incentives, as defined by LEED correspond
to specific development attributes related to site development, water,
efficiency, energy efficiency, material selection, and outdoor environmental
quality.
LEED